Home
Important Links
Pre-Start Checklists
Manufacturing Scanning
Contact us
Sign in
Contact Us
angle_line Start Checklist
Angle Line ID
Did the previous operator shutdown correctly?
Yes
No
Is there any damaged components/oil leaks on machine?
Yes
No
Have you checked if the machine needs lubricant?
Check all lubricated points as per user manual
Yes
No
Is there wear or damage to tooling, replace as needed?
replace tooling needed
Yes
No
Check proximity switches/sensors for damage , is there any damage?
Yes
No
Check hydraulic unit oil level in sight glass, is hydraulic oil low?
Yes
No
Have you checked water separator on pneumatic line, drain if needed. Also note level of oil in oiler, fill if needed ?
Yes
No
Have you checked that punches/dies and shear blades are tight ?
Yes
No
Have you checked entry and exit measuring wheels and signomat?
Yes
No
Do the punches and dies in raptor correspond to the punches and dies in the machine?
Yes
No
Do you have material?
Ensure material to be ran is present, programs are ready and prints are available to verify calibrations. Check first part of day, then every third part. Note any deviation to supervisor
Yes
No
Comments
Who is completing the checklist?
angle_line Operators...
Tim Lee
Joon Lee
Matias Plata
Jason Scerri
Jake Brady
Tom Armstrong
Confirm