Home
Important Links
Pre-Start Checklists
Manufacturing Scanning
Contact us
Sign in
Contact Us
Blaster Shut Down Checklist
Blaster Number
Do not disconnect power supply by any means for approx 10 minutes
Yes
No
Do NOT stop machine with Emergency stop button unless genuine emergency
Yes
No
Is there any damage to machine?
If so report to Supervisor
Yes
No
Have all waste materials been disposed of as required?
Yes
No
Has the machine been cleaned after use?
Yes
No
Has the filtration and dust bins been emptied?
Yes
No
Has the immediate area been swept to ensure shot build up in walkways?
Yes
No
Is the machine capable of being used by next shift?
Yes
No
Who is completing the checklist?
blaster Operators...
Shane Loosemore
Marcus Perry
Comments
Confirm